Installation
1. The floor is inspected by removing all objects located and covering openings where the product can escape.
2. Equip access to the attic with a wooden frame around the flap to hold the insulation, if necessary
3. It then proceeds to blow insulation by a pneumatic machine.
4. The minimum thickness of the product is measured with graduated rulers.
5. As the blowing is performed regularly distributes the product.